Plotting the disruption scenarios

Total scenario cost versus disruption steps. The number of edges (roadway segments) used at each step is shown by color of the step.

Maps

Symbologize By Rank

The map below plots the optimal route in the baseline scenario and highlights the top ten links by importance. Hover over each highlighted link to see its Net Source OID (link identifier) and rank.

Symbologize By Total Cost

The top ranked links for importance are removed from the network one-by-one in subsequent disruption scenarios. The map below plots the optimal road links in the baseline scenario and highlights each rank removed based on the resulting scenario cost in the associated disruption scenario.

Relationship of betweenness centrality and volume

Using the edges in the optimal solution.

Both panels show the relationship between betweenness centrality and background commodity volume flow for the links used in the optimal solution for this scenario.

The left panel colors in the points by the rank in terms of volume. The top links are colored in. The right panel colors in the points by the rank in terms of sum of betweenness centrality. The top links (used for the disruption test) are colored in.